Federal Aviation Administration
Locations:
Sort By: Keyword Sort:

Data Current as of: Wed, 29 Jan 2020 01:55:00 UTC

B0517/20 NOTAMR B8418/19
Q) LECM/QOBCE/IV/M  /A /000/999/4318N00255W005
A) LEBB B) 2001280748 C) 2001292359
E) REF SUP AIRAC SUP 20/19.-WORKS FOR THE RENEWALL OF LIGHTNG 
SYSTEMS ON APRONS:
FHASE 3 ACT:
OBST ERECTED AT THE FOLLOWING COORD: 
 -POLE 6: 0025349.10W 431754.23N
 -POLE 7: 0025348.39W 431753.97N
 -POLE 8: 0025347.53W 431753.66N
 -POLE 9: 0025346.73W 431753.37N
 -POLE 10: 0025345.98W 431753.09N
 -POLE 11N: 0025418W 431805N
  MAX HGT 10M (52M ALT
CREATED: 28 Jan 2020 07:49:00 
SOURCE: EUECYIYN
B0516/20 NOTAMR B8417/19
Q) LECM/QOBCE/IV/M  /A /000/999/4318N00255W005
A) LEBB B) 2001280747 C) 2001292359
E) REF SUP AIRAC 20/19.-WORKS FOR THE RENEWAL OF LIGHTING SYSTEMS
ON APRONS:
PHASE 1 ACTIVATED:
 -NEW FLOODLIGHTING POLE 5S ERECTED AT COORD 431802.3768N
  0025608.1544W. MAX HGT 30M (ALT 82M)
 -NEW FLOODLIGHTING POLE 6N ERECTED AT COORD 431812.0653N
  0025413.5156W. MAX HGT 40M (ALT 86.5M)
 -NEW FLOODLIGHTING POLE 7N LOCATED AT COORD 431811.44393N
  0025414.81134W. MAX HGT 40M (ALT 86.5M)
 -NEW FLOODLIGHTING POLE 8N LOCATED AT COORD 431809.28609N
  0025410.09087W. MAX HGT 20.5M (ALT 65.5M))
  -NEW FLOODLIGHTING POLE 9N LOCATED AT COORD 431808.20076N
  0025412.55244W. MAX HGT 19.5M (ALT 64.5M)
 -NEW FLOODLIGHTING POLE 10N LOCATED AT COORD 431806.98404N
  0025414.68584W. MAX HGT 18.5M (ALT 63.5M
CREATED: 28 Jan 2020 07:48:00 
SOURCE: EUECYIYN
B0515/20 NOTAMR B7559/19
Q) LECM/QMNHW/IV/BO /A /000/999/4318N00255W005
A) LEBB B) 2001280746 C) 2001292359
E) REF AIRAC SUP 20/19, WORKS FOR THE RENEWAL OF LIGHTING 
SYSTEMS ON APRONS. PHASES 1, 2 AND 3 ACT
CREATED: 28 Jan 2020 07:46:00 
SOURCE: EUECYIYN
B0278/20 NOTAMN
Q) LECM/QMNTT/IV/BO /A /000/999/4318N00255W005
A) LEBB B) 2001300000 C) 2002122359
E) TRIGGER NOTAM - AIP SUP 09/20 WEF 30-JAN-20 TIL 13-AUG-20 EST:
WORKS FOR THE RENEWAL OF LIGHTING SYSTEMS ON APRONS.
CREATED: 16 Jan 2020 10:59:00 
SOURCE: EUECYIYN
B0277/20 NOTAMN
Q) LECM/QMRTT/IV/BO /A /000/999/4318N00255W005
A) LEBB B) 2001300000 C) 2002122359
E) TRIGGER NOTAM - AIP SUP 08/20 WEF 30-JAN-20 TIL 13-AUG-20 EST:
PAVING IMPROVEMENT AND REPAIR WORKS OF RWY12/30.
CREATED: 16 Jan 2020 10:56:00 
SOURCE: EUECYIYN
B0264/20 NOTAMN
Q) LECM/QFATT/IV/BO /A /000/999/4318N00255W005
A) LEBB B) 2002270000 C) 2003122359
E) TRIGGER NOTAM - PERM AIP AMDT AIRAC 01/20 WEF 27-FEB-20:
- RAMP AGENTS.
- TAXIING GUIDANCE SYSTEMS.
- MAX ELEV TDZ RWY 12.
- PAPI (MEHT) RWY 12/30.
- VAC CHART: OBSTACLES.
CREATED: 16 Jan 2020 07:13:00 
SOURCE: EUECYIYN
B8413/19 NOTAMN
Q) LECM/QMRXX/IV/NBO/A /000/999/4318N00255W005
A) LEBB B) 1912181131 C) 2001292359
E) REF SUP 32/19.-REPLACEMENT OF EDGE MARKINGS IN RWY10/28:
WORKS NOT ACCOMPLISHED. SUPPLEMET CANCELLED
CREATED: 18 Dec 2019 11:31:00 
SOURCE: EUECYIYN
B7983/19 NOTAMN
Q) LECM/QMXHW/IV/M  /A /000/999/4318N00255W005
A) LEBB B) 1912050000 C) 2003032359 EST
E) REF SUP 130/19 COMPLIANCE WORKS FOR TWY STRIPS, 
PHASES 2 AND 3 ACT
CREATED: 02 Dec 2019 17:34:00 
SOURCE: EUECYIYN
B7061/19 NOTAMR B4934/19
Q) LECM/QMRHW/IV/NBO/A /000/999/4318N00255W005
A) LEBB B) 1910281653 C) 1912312359 EST
E) REF SUP 31/19.- PAVING IMPROVEMENT AND REPAIR WORKS OF RWY 12/30
PHASE 2 ACT (WIP ON RWY12/30 STRIP).
PAPI12 (MEHT): 3,1 DEG (16,28M/53,41FT)
RWY12 TDZ ELEV (38,74M)
PAPI30 (MEHT): 3,4 DEG (19,02M/62,40FT
CREATED: 28 Oct 2019 16:53:00 
SOURCE: EUECYIYN

  
Number of NOTAMs:  9        End of Report