Federal Aviation Administration
Locations:
Sort By: Keyword Sort:

Data Current as of: Mon, 20 May 2019 09:06:00 UTC

B0214/19 NOTAMR B0062/19
Q) EHAA/QFAHW/IV/NBO/A /000/999/5133N00433E005
A) EHSE B) 1904110901 C) 1907110900 EST
E) WIP AT CONSTRUCTION AREA SOUTH OF THE AIRFIELD. HEAVY EQUIPMENT 
MOVING WITHIN AND OUTSIDE THE AIRFIELD AREA.
B0126/19 NOTAMR B0768/18
Q) EHAA/QPECH/V /NBO/A /000/999/5133N00433E005
A) EHSE B) 1903120907 C) 1906040900 EST
E) DEP PROC RWY25 CHANGED (NOISE ABATEMENT PROCEDURE):
AFTER TAKE-OFF MAINTAIN RUNWAY TRACK UNTIL RUNWAY END.
TURN LEFT TRACK 240DEG MAG UNTIL ABOVE HIGHWAY A58.
FOLLOW THE HIGHWAY AND CLIMB TO 730FT AMSL.
JOIN THE TRAFFIC CIRCUIT OR LEAVE VIA EXIT POINT RWY25.
REF AIP EHSE AD 2.22 PARA 1 ITEM 9.

  
Number of NOTAMs:  2        End of Report