Federal Aviation Administration
Locations:
Sort By: Keyword Sort:

Data Current as of: Sun, 26 Jan 2020 01:33:00 UTC

A0027/20 - PAVEMENT FAILURE BTN APN J5 AND J7 NEAR THE TAXI LANE. PILOTS TO
EXER CTN WHILE TAXIING ALONG THIS AREA. 21 JAN 09:12 2020 UNTIL 18 MAR 23:59
2020. CREATED: 21 JAN 09:12 2020
A0016/20 - WIP AT THE TAXILANE BTN BAY 4 AND HOTEL TEN (H10) - REF AIP SUP
23/19.
ALL ACFT TO AND FROM BAY 2A TO 3C TO USE TWY M. 14 JAN 05:00 2020 UNTIL 31 JAN
23:59 2020 ESTIMATED. CREATED: 13 JAN 13:48 2020
A0015/20 - WIP AT BAY F2.ACFT TO USE ALTERNATIVE PARKING BAYS. 14 JAN 05:00 2020 UNTIL 31
JAN 23:59 2020 ESTIMATED. CREATED: 13 JAN 13:42 2020
A0544/19 - ALL VISUAL APPROACHES TO RIGHT BASE RWY 06 SHALL BE CONDUCTED
SUCH THAT THE A/C POSITION IS NOT LESS THAN 1.5NM FROM THE
THRESHOLD RWY 06 TO AVOID OVERFLYING THE FUEL TANKS. 31 DEC 10:00 2019 UNTIL
PERM. CREATED: 31 DEC 09:49 2019
A0532/19 - LOOSE SFC BEHIND BAY 18. ALL ACFT IN AND OUT OF BAY 19 TO 21 TO
SHUT DOWN ENGINES AND BE TOWED. 19 DEC 16:32 2019 UNTIL 15 FEB 23:59 2020 ESTIMATED.
CREATED: 19 DEC 16:32 2019
A0518/19 - WIP TO REPLACE ALS RWY 06 AND RWY 24. MEN AND MACHINERY ON GND.
PILOTS TO FOLLOW ATC INSTRUCTIONS. DLY BTN 05H00 TO 15H00, 03 DEC 12:50 2019
UNTIL 30 JAN 23:59 2020 ESTIMATED. CREATED: 03 DEC 12:49 2019
A0303/19 - COR ON APN1 PRKG BAYS COORD  OF AIRAC AIP SUP 23/19:
BAY 14: 011953.5333S 0365524.7335E WIDTH 71.10M
BAY 13: 011951.7896S 0365523.8432E WIDTH 36.70M. 19 AUG 13:00 2019 UNTIL PERM.
CREATED: 19 AUG 13:38 2019

  
Number of NOTAMs:  7        End of Report